Sorry I havent been here for a while,  Job of the month Jan 2016 London

I bring you to day to our project 352 square metres of overlay roofing system In Kenington London SE14,  Our client is a property managment company mcs.  The works entailed was to give the existing asphalt roof system a new lease of life so we opted for a nord bitumi high performance system which will give them an aditionall 20 years of guarantee.  It is common to upgrade the insulation when carrying out this type of roofing system however this was not required on this ocasion   


flat roof drip detail aldersbrook roofingflat roofing london Aldersbrookaldersbrook roofing Felting londonPrior to the installation a coil test was taken to find the make up and condition of what is made up underneath.

The roof had to be primed first to allow good adhesion between the roofs  which was then fitted with a perforated layer cut back from the edges.  then a secondary layer of  Flexpol 3mm sbs underlay, with bullnosed troweling of the joins. then followed with  the  Nordegum capsheet layer,  all these felts are laid with a continous bleed. It is important when laying a flat roof to stagger the bonds of the intermediary layers and also fit the perimetter edges with a seperate upstand aprons as this is part of the system requirements on most flat roofing torch applied systems.  

 It Is also important that the roof is designed well with adequate falls to drain off and areas were ponding (water stagnating for a period of over 48 hours).
should be adressed prior to aplication  

I have been personally laying flat roof systems now for over 28 years and have seen a lot of changes in flat roofing systems over the years all for the better.  

If you need to buy materials (london m25 only)for your project or need advice or  fitters  (our fitting teams work nationally) then please give us a call on 0800 956 1996 We will be happy to help
thanks danny






  3mm underlay sbs flexpol free london m25 delivery
  



nordegum capsheet 4.5 kg free london m25 delivery




flat roofers london aldersbrookroofinghigh performance felts aldersbrook roofing

3 Comments to job of the month jan 2016:

Comments RSS
cheap christian louboutin on 27 December 2016 02:12
It is important when laying a flat roof to stagger the bonds of the intermediary layers and also fit the perimetter edges with a seperate upstand aprons as this is part of the system requirements on most flat roofing torch applied systems.
Reply to comment


can someone write my paper for me on 11 September 2017 15:04
Roof making is most difficult part because we know all the perimeters and direction well before making the roof it is the activity of good civil engineer .Useful info for civil engineers method of telling is also impressive .
Reply to comment


loemrntdherid1 on 01 March 2018 03:17
This is a really good read for me.
Reply to comment

Add a Comment

Your Name:
Email Address: (Required)
Website:
Comment:
Make your text bigger, bold, italic and more with HTML tags. We'll show you how.
Post Comment
RSS

Recent Posts

slipped tile (job of the month)
singleply Epdm shed roofs
Flat roofing overlays
chas acredited
what flat roof should i choose

Categories

December roof projects
January roof project
NEWS
November varied roof projects
October varied roof projects
roof projects
Special Offers
powered by